Field application report 053

Exceeds Every
Expectation

Case Study Platinum Client

Curve S150 Trial

Introduction

A platinum client contacted Pump & Abrasion Technologies® to assist with a more reliable system for the Recleaner application. A complete pump audit was performed. The lifespan on the parts was a big problem for the plant and they needed something that would reduce their downtime due to maintenance.

Trial objective

The main objective was to improve wear life therefore reducing downtime due to maintenance. The cancelation of gland service water was also a necessity.

Case Study

Resulting in

Curve C200 Trial

Resulting in

Improved
Safety on site

Reduced
Downtime hours

Increased
overall producivtity

Speak to a pump system specialist